ELR1 – pumping station Phase II/12

elr1-algeria-min
Sonatrach
Algeria

Description: realization of pumping station SP1 including tie-in/interface with pipelines LR1, ELR1 and injections coming from Z.C.I.N.A. and C.I.N.A.. Fuel gas flowline (4”, 13 km) from GR1 to SP1; Overhead lines 30 kV, 30 MVA from PDE n.04 to SP1 ELR1; Electrical sub-station; Paved road connecting SP1 to RN3
Duration: 2013 ÷ 2016
Scope of Work: Engineering, Procurement, Construction & Commissioning

top